Fixed-Price Agricultural Steel Buildings

Design-build from foundation to finish.
One contractor. One price.

Building a steel structure for your farm should be straightforward. You get a price. You get a timeline. And the building goes up without surprises.
At Felski Contracting, that’s exactly how it works. We handle the design, concrete, steel supply, and construction under one fixed-price contract. No brokers. No finger-pointing between trades. Just one team responsible for the entire build.

What Your Fixed-Price Quote Covers

Every Felski project is quoted as one fixed price. Not an estimate. Not a starting point. A real number you can plan around.

Your quote is fully itemized and includes:

  • Building design & layout — customized to your operation
  • Concrete & foundations — included in the price
  • Steel building package — supply and delivery coordinated
  • Full construction & erection — one crew, start to finish
  • Doors, insulation & accessories — specified upfront
Everything is listed. Everything is clear. If something isn’t included, we tell you before you sign, not after.

No Skeleton Quotes

A skeleton quote is a low number that doesn’t include the full scope. Foundations missing. Doors extra. Labor not included. The price looks great until the real costs show up.
We don’t do that. Our quotes show the real cost of the complete project so you can make a confident decision.
Transparent Pricing. No Surprises.

Built for Farmers, Not Middlemen

Most steel building companies sell you a kit and wish you luck. Others broker deals between you and whoever’s available. Either way, you end up managing the project yourself.

What That Looks Like in Practice

  • One point of contact — from first call to final walkthrough
  • Owner-led projects — the people who own the company are on your job site
  • No subcontractor shuffle — our crew builds your building
  • Fast decisions — no waiting on corporate approvals

Built to Last Decades, Not Just Years

Steel doesn’t rot, warp, or attract pests. It costs roughly half of what wood costs in maintenance over the life of the building. Plus, non-combustible steel often means lower insurance premiums.

Faster Build Times

Pre-engineered steel goes up faster than wood. But speed also comes from how a project is managed. When one contractor handles design, concrete, and erection, there’s no waiting between trades.
Compare steel to wood, where you’re looking at repainting, replacing rotten sections, and re-roofing every 15 to 20 years. Over the life of the building, steel costs roughly half of what wood costs in maintenance and repairs.

And because steel is non-combustible, most insurance providers offer lower premiums. That’s real money back in your pocket every year.

Agricultural Steel Buildings We Build

Our design-build process is tailored for real farm use. Every building is designed around how you actually use it. Not a generic kit dropped on a slab.

Serving Farmers Across Western Canada

We build agricultural steel buildings throughout the Prairies.
Each province has different building codes and climate conditions. We account for that from day one so there are no surprises mid-build.

Ready to Get a Real Price?

If you’re planning a farm shop, equipment storage, or any agricultural steel building and want it done right, we’re ready to help.
No pressure. No sales pitch. Just a clear, fixed-price quote for your project.

Common Questions

About Agricultural Steel Buildings

All Felski Contracting projects are quoted at a fixed price, not cost-plus. Your quote is fully itemized and shows exactly what is included so there are no surprise charges later in the build.

Our service includes design, engineering coordination, concrete and foundations, steel supply, delivery, and full construction. You work with one contractor from start to finish.

No. Felski Contracting coordinates engineering as part of the project during fabrication. You don’t need to hire or manage an engineer separately.

Your quote clearly outlines what is included and what is not. Anything excluded is identified upfront so there are no assumptions or hidden costs later.

Most projects follow a clear timeline: design and foundation prep in the first few weeks, steel fabrication, then construction and completion. Exact timelines depend on building size and location.

What's your next step?

We are here to support, educate and serve you every step of the way.

Start your project

Receive a free quote for your next project, without the usual sales jargon.

Get Educated

Browse our library of resources to learn more about steel buildings and our expertise.